镀锌铁皮风管安装注意事项

来源:/

【 发布于:2018-04-13 18:09:15 】


1、济南镀锌管采用镀锌钢板,其厚度应符合规定。

1, galvanized steel pipe in Ji'nan is galvanized steel, its thickness should comply with the regulations.

2、形风管的弯管,可采用内弧型或内斜线矩形弯管。当边长A大于或等于500mm时,应设置弯管导流片。矩形风管的三通或四通,可采用分叉式或分隔式。

2, the elbow of the air duct can be made of inner arc or inner oblique rectangular bend. When the side length A is greater than or equal to 500mm, elbow pipe deflector should be set up. The three or four buses of the rectangular air duct can be split or separated.

3、济南镀锌管管与法兰连接,翻边应平整,宽度应一致且不小于6mm,并不得有开裂及孔洞,对角及翻边缝应涂上密封胶。

3, Ji'nan galvanized pipe pipe and flange connection, flanging should be smooth, the width should be consistent and not less than 6mm, and no cracks and holes, diagonal and edge sealant should be coated with sealant.

济南镀锌管

4、风管法兰制作应先做好模具。模具做好后检查模具的几何尺寸,对角线是否符合设计及规范要求,检查无误后进行下料、校直、钻铆钉孔(孔距不大于150mm)、组装、焊接、钻孔。另外对边长大于800的风管应加固措施。风管及法兰尺寸的允许偏差和检验方法见下表:

4, the flanges of the wind pipe should be made a good job. After the die is done, the geometry of the mold is checked, whether the diagonal line is in accordance with the design and specification requirements. After inspection, the blanking, straightening and drilling rivet holes (the hole distance is not more than 150mm), assembly, welding and drilling are carried out. In addition, reinforcement measures should be taken for the wind pipe with a length greater than 800. The allowable deviation and inspection method for the size of the air pipe and flange are shown in the table below.

5、济南镀锌管安装过程中,进行风管分段检漏测试。风管制作安装后,要检验合格才交付下步保温工序。

5, during the installation process of Ji'nan galvanized pipe, we conduct the leak detection of the wind pipe. After the production and installation of the duct, it is necessary to verify the qualification before delivering the next insulation process.

6、风管吊杆的末端要满足调节风管标高的要求,吊杆制作好后,根据风管的布置位置进行安装,水平风管的间距不大于3m,垂直风管不大于4m。

6, the end of the pipe hanger should meet the requirements of regulating the height of the wind pipe. After the hanger is made well, it is installed according to the arrangement position of the wind pipe. The distance between the horizontal wind pipe is not more than 3m, and the vertical wind pipe is not more than 4m.

7、镀锌风管支吊架、防火阀、电动风阀等部件安装处必须单独设支吊架处,一般风管每隔3米左右设支吊架一个,支吊架的作法可参照采暖通风国家标准。

7. The installation of the supporting hanger, the fire valve, the electric wind valve and other parts of the galvanized wind pipe must be set up separately, and the general wind pipe is set up every 3 meters, and the method of supporting the hanger can refer to the national standard of heating and ventilation.

8、风管支、吊架不得设置在风口、阀门、检查门及自控机构处。吊杆不得直接固定在法兰上。每隔两个吊架用角铁设置一个防晃动支架。

8, the air pipe support and hanger shall not be installed at the draught, valve, check door and automatic control department. The hanger shall not be directly fixed to the flange. Every two hanger with angle set an anti sway bracket.

本文由济南镀锌管友情奉献,更多有关的知识请点击:我们将用最先进的技术,最真诚的态度,为您提供最为全面的服务。我们将会陆续向大家奉献,敬请期待。

This article by Ji'nan galvanized pipe friendship dedication, more related knowledge please click: we will use the most advanced technology, the most sincere attitude, to provide you with the most comprehensive service. We will continue to dedicate to you. Please look forward to it.